138 Newton Abbot - 25/00345/MAJ - Langford Bridge
PDF 2 MB
Additional documents:
Decision:
RESOLVED
RESERVED MATTERS BE GRANTED, subject to the following conditions and an additional INFORMATIVE which will advise that future developments related to the hereby approved road should be designed to minimise the reliance upon on street parking. The final wording to be agreed by the Head of Development Management in consultation with Councillors Bullivant and MacGregor.
1. Development in accordance with approved plans
|
1. Development in accordance with approved plans Date Received |
Drawing/Reference Number |
Description |
|
26 Feb 2025 |
WOLB2/3-1300 REV P1 |
Site Location Plan |
|
07 Apr 2025 |
ES23.051 PH4-02.03 REV P1 |
Primary Infrastructure Highway Sections |
|
19 Aug 2025 |
ES23.051 03.50 REV P1 |
Drainage Outfall Plan |
|
03 Nov 2025 |
ES23.051 SK-03.20 REV P3 |
Site-Wide Drainage Strategy - Catchment Areas |
|
03 Nov 2025 |
ES23.051 30.04 REV T1 |
Adoptable Highway Construction Details - Sheet 4 |
|
03 Nov 2025 |
ES23,051 REV A |
SuDS Maintenance Plan |
|
26 Nov 2025 |
PERSW24830-12B |
SUDs Proposals |
|
01 Dec 2025 |
ES23.051 PL-RMA-02.01 REV P3 |
Spine Road General Arrangement Plan |
|
01 Dec 2025 |
ES23.051 PL-RMA-03.00 REV P8 |
Drainage Strategy Sketch Overall Sheet |
|
01 Dec 2025 |
ES23.051 PL-RMA-03.01 REV P9 |
Drainage Strategy Sketch Inset Sheet |
|
01 Dec 2025 |
ES23.051 PL-RMA-10.02 REV P2 |
Spine Road Surfacing Plan Sheet 2 |
|
01 Dec 2025 |
ES23.051 PL-RMA-20.01 REV P2 |
Highway Visibility Plan Sheet 1 |
|
01 Dec 2025 |
ES23.051 PL-RMA-20.02 REV P2 |
Highway Visibility Plan Sheet 2 |
|
01 Dec 2025 |
ES23.051 PL-RMA-07.02 REV P3 |
Vehicle Tracking Plan - Refuse |
|
01 Dec 2025 |
ES23.051 PL-RMA-08.00 REV P3 |
Impermeable Area Plan |
|
01 Dec 2025 |
ES23.051 PL-RMA-09.00 REV P3 |
Overland Flow Flood Exceedance |
|
01 Dec 2025 |
ES23.051 PL-RMA-10.01 REV P3 |
Spine Road Surfacing Plan Sheet 1 |
|
01 Dec 2025 |
ES23.051 PL-RMA-07.01 REV P3 |
Vehicle Tracking Plan - Fire |
|
30 Jan 2026 |
PERSW24830-11B 2OF2 |
G.I. Proposals |
|
30 Jan 2026 |
PERSW24830-11B 1OF2 |
G.I. Proposals |
REASON: To ensure compliance with the approved drawings.
2. Landscaping implementation
Notwithstanding the hard and soft landscaping details shown on Green Infrastructure and SuDS proposals drawings numbered PERSW24830-11B 1of 2, PERSW24830-11B 2 of 2, and PERSW24830-12B, full details of the sizes, locations, specifications and maintenance strategy for the tree pits and rainwater garden annotated on PERSW24830-11B 2of2 shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Lead Local Flood Authority and Devon County Council Highway Authority.
In all other respects, the approved hard and soft landscaping scheme shall be carried out strictly in accordance with the approved details submitted on the approved Green Infrastructure and SuDS proposals drawings numbered PERSW24830-11B 1of2, PERSW24830-11B 2of2, and PERSW24830-12B.
All approved hard and soft landscaping, including the SuDS and Green Infrastructure proposals, shall be completed and thereafter managed and maintained in accordance with a timetable of implementation previously approved in writing by the Local Planning Authority.
Thereafter, following substantial completion of the development hereby permitted, all soft landscape works shall be protected, managed and maintained in accordance with the approved details and to a standard in accordance with the relevant recommendations of British standard 4428 1989 Code of Practise for general landscape operations. ... view the full decision text for item 138
Minutes:
Reserved Matters application (appearance, landscaping, layout and scale) for the construction of highway and drainage (infrastructure phase); pursuant to Outline Planning Permission reference 19/00238/MAJ
The Principal Planning Officer presented the application and the agenda report.
Public Speaker, supporter Mr Clark- Applicant – referred to the following issues:
· The application aligns with the Principle Master Plan
· Road alignment
· Drainage
· Landscaping
· Continuation of the tree lined road
· Attention to light spills to protect bats
· No objections raised from stakeholders i.e. Natural England, Highway Authority, Flood Authority
In response to questions, advice given included:
The Highway will be adopted when all infrastructure is complete.
Road parking restrictions would be covered by the phase 3 application
It was proposed by Councillor Bullivant and seconded by Councillor Macgregor that an additional condition be added that the road be designed to minimise on street parking.
The Principal Planning Officer advised that it would not be reasonable or appropriate to add as a condition because this has not been requested by the Highway Authority, nor would such a condition meet the relevant tests necessary for imposing conditions. However, the Principal Planning Officer did suggest that an informative could be included on the formal decision notice making reference to this point.
Councillors Bullivant and Macgregor withdraw the proposal for a further condition.
In response to further questions, advice given included:
- Cycleways and drainage will be of the standards required.
- Dimensions of the road was detailed at paragraph 6.19 of the agenda report.
- Although not relevant to this application the Highway Authority can take action against debris on roads.
- Technical drainage matters were under negotiation between the applicant and the Lead Local Flood Authority and were subject to a separate application relating to the discharge of a surface water condition. Any approval of this reserved matters application would not negate the need for the technical drainage details to remain subject of separate approval under that ‘conditions discharge’ application.
- Street lighting was subject to separate approval.
- Speed limits would be determined by the Highway Authority through the highways adoption process.
- On street parking and the design of the road could be dealt with through an additional informative.
The representative from the Lead Local Flooding Authority clarified the situation regarding technical drainage matters and advised that, for the purposes of this reserved matters application, the Attenuation Plans are sufficient.
It was proposed by Councillor Palethorpe, seconded by Councillor Nutley that the application be approved as set out in the agenda, with the additional informative regarding the road design to minimise on street parking as suggested by Councillors Bullivant and Macgregor above.
RESOLVED
RESERVED MATTERS BE GRANTED, subject to the following conditions and an additional INFORMATIVE which will advise that future developments related to the hereby approved road should be designed to minimise the reliance upon on street parking. The final wording to be agreed by the Head of Development Management in consultation with Councillors Sanders as Chair, Bullivant and MacGregor.
1. Development in accordance ... view the full minutes text for item 138