Agenda item

22/01067/MAJ - Gatehouse Farm, Dawlish

Minutes:

The Business Manager introduced the application to the Committee

 

Public Speaker, Supporter – Spoke on:

·       Main road width is agreeable

·       Parking spaces on road

·       Road corridor is agreeable

·       Sewage flow

·       Road heights

·       Heating

·       Cycle route

·       S106 ensures visibility changes come to committee

·       Range of properties

·       Contribution to red rock centre and infrastructure

 

Comments from Councillors included:

·       Play area

·       Need for bike protection

·       Tree in play space is safety concern

·       Water hazard

·       Town Council concerns

·       Lack of affordable units

·       Dwellings are unattractive

·       Self build plots

·       Flats are affordable/desirable to some

 

In response Officers clarified that:

·       Green infrastructure officer can address concerns

·       Condition 17 addresses concerns

·       Need to ensure people receive transport vouchers

·       19 percent affordable

·       Lumped flats but not affordable houses

·       Garages in houses act as storage points

·       Self build plots not part of affordable provision

 

It was proposed by Councillor Bullivant and seconded by Councillor Nutley that permission be granted as set out in the report.

 

A vote was taken – the result was 11 for, 2 against, and 0 abstained.

 

Resolved

 

That permission be granted subject to the following conditions:

 

1.     Accord with approved plans.

2.     Prior to commencement, full details of link road join into Area 3 to include details of cycle paths, pedestrian paths, signage and road markings.

3.     Completion in accordance with approved WSI before occupation.

4.     Details of tree pits before construction of road (other than the section already with consent) and locations of underground service runs to ensure no conflict with planted trees.

5.     Trees to BS 8545:2014 standard; landscaping implementation, maintenance and replanting within 5 years if any die.

6.     Sheds/cycle parking details for every dwelling to be submitted. To be provided before occupation of open market dwellings and handover of AH.

7.     Bin storage details for all dwellings to be submitted and provided before occupation.

8.     Architectural details and materials of dwellings before reaching damp proof course.

9.     Details of boundaries, any under build to dwellings and retaining wall details before their construction. Any boundaries directly fronting open space/GI shall be brick walls, not timber fencing.

10.Details of solar panels and installed/operational before occupation before occupation plus compliance with Energy Report.

11.Details of BNG (bat, bird and bee boxes, hedgehog holes) to be submitted and provided before occupation.

12.Timing of works at sunrise/sunset to avoid bat disturbance.

13.No lighting to be installed on site (except for domestic lighting on properties on timers) above that agreed in the approved lighting scheme; further details to be submitted and agreed if this changes. The northern and western dark corridors to be maintained at or below 0.5 lux.

14.Marking out of allocated parking and retention of parking spaces thereafter. Garages to remain as garages and not converted to living accommodation.

15.Works to accord with the Arboricultural Method Statement and Tree Protection Plans.

16.Details of and provision of electric car charging points before occupation.

17.LEAP water safety assessment with safety measures, if necessary, before LEAP is first brought into use.

18.M4(3) dwellings to be provided with showers.

19.GI Transfer Plan prior to occupation to clarify between dwelling responsibilities and management company.

20.Notwithstanding the approved plans, in the relevant phase, unless set out in the marketing details for the commercial area, demonstration that the cycle/pedestrian link will continue from the link road to the LEAP/SuDS area.

Supporting documents: