Agenda item

Kingskerswell - 25/01632/FUL - Stables and Sand Ring South of Saturdays Lane

Decision:

RESOLVED

 

PLANNING PERMISSION be granted subject to the following conditions:

 

Standard conditions

 

1. The development hereby permitted shall be begun before the expiry of three years from the date of this permission.

 

REASON: In accordance with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2. The development hereby permitted shall be carried out in accordance with the application form and the following approved plans/documents:

Date Received

Drawing/Reference Number

Description

28 Jan 2026

1652 PL3 REV F

Proposed Site Plan

28 Jan 2026

1652 S1 REV B

Location Plan

28 Jan 2026

1652 PL4 REV F

Proposed Hut Plan & Elevations

28 Jan 2026

1129/01 REV B

Landscape Plan

28 Jan 2026

1129/02 REV A

Landscape Specification

28 Jan 2026

1129/03

Landscape Sections

 

REASON: In order to ensure compliance with the approved drawings.

 

Prior to commencement conditions

 

3. Notwithstanding the hereby approved plans and documents, prior to commencement of the herby approved development a Landscape Ecological Management Plan (LEMP) for the maintenance and management of on-site habitats and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority. The LEMP shall be prepared with any future approved Biodiversity Gain Plan and the hereby approved landscaping details and shall include:

 

(a) A non-technical summary;

(b) The roles and responsibilities of the people or organisation(s) delivering the LEMP;

(c) The planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan, and the approve landscaping scheme;

(d) The management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30-years from the completion of development; and

(e) The monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority.

Works shall proceed in accordance with the approved details or in accordance with revised details which shall have first been submitted to and approved in writing by the local planning authority.  The approved habitat creation and enhancement works shall be maintained for a period of 30-years.

 

REASON: To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990, and to ensure that the new landscaping is managed appropriately for the benefit of visual amenity.  The details are required to be approved prior to the commencement of development to ensure that the actions needed to create and enhance habitat onsite as well as maintain it for 30 years from the completion of development have been appropriately secured.

 

Prior to the sitting of hut

 

4. Prior to the first sitting of the hereby approved huts on the site, details including specification, material and finishes for the elevational timber cladding and the roof covering for each of the huts shall be submitted to and approved in writing by the Local Planning Authority. The development shall then be carried out in accordance with the approved details.

 

REASON: In the interest of ensuring that the development has an acceptable landscape impact.

 

Prior to first use conditions

 

5. Prior to the first use of the hereby approved development a maintenance and management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include the following:

(a) Security measures that would be deployed on the site;

(b) Procedures for checking-in and checking out of guests;

(c) Procedures and timings for ongoing cleaning, upkeep and maintenance o the stie and facilities;

(d) Details of waste management including, the responsible body, frequency of management, recycling regimes and size of any containers required.

The development shall thereafter be carried out and operated for its lifetime in accordance with the approved maintenance and management plan

 

REASON: In the interest of ensuring that permanent management presence on site is not required, for the benefit residential amenity of surrounding properties, and to ensure that waste is managed on site appropriately.

 

6. Prior to the first use of the hereby approved development the new access gate and associated boundary treatment as defined on the Landscape Plan referenced 1129/01 REV B shall be installed, maintained, and retained for the life of the development. Notwithstanding the hereby approved plans the new access gate, and all other new non-vegetated boundary treatments shall be installed in accordance with details that shall have been first submitted to and approved in writing by the Local Planning Authority. The details shall include elevational details, materials, finish, height, and location. The development shall thereafter be carried out in accordance with the approved details.

 

REASON: In the interest of ensuring that the proposed boundary treatments are appropriate for their rural setting and to ensure that the enhancement resultant from the removal of the existing gate is delivered for the benefit of the local landscape.

 

7. Prior to the first use of the hereby approved development a new boundary treatment within the site shall be installed, maintained and thereafter retained in accordance with details which shall have been submitted to and approved in writing by the Local Planning Authority under Condition 5 of this permission.

 

REASON: In the interest of ensure that lightspill from the development is managed to an acceptable level in the interest of legally protected South Hams SAC bat species. 

 

8. Prior to the first use of the hereby approved development the surface water management scheme and the foul water management scheme shall be installed, maintained and thereafter retained to serve the development for its lifetime in strict accordance with the hereby approved Storm Drain Report Percolation Testing & Soakaway Design referenced REV A JAN 2026 and Foul Percolation Testing Report Drawings Calculations referenced REV A JAN 2026 both received on 28th January 2026.

 

REASON: In the interest of ensuring that surface water from the development is appropriately managed, to ensure that floor risk does increase on site or elsewhere, and to ensure that foul water is dealt with appropriately to avoid pollution.

 

9. Prior to first use of the hereby approved development, an electric vehicle charging point shall be installed at the site and shall be commissioned and available for use.  The charging point shall as a minimum be a 32A (7.3kW) Mode 3 unit and shall be maintained in good working order thereafter as specified by the manufacturer.

 

REASON: In the interest of carbon reduction.

 

Compliance conditions

 

10. The development hereby permitted shall be carried out strictly in accordance with the Biodiversity Gain Plan, which shall be prepared in accordance with the submitted BNG Metric received on 3rd February 2026, and shall be approved under the General Condition relating to Biodiversity Gain.

 

REASON: To ensure the development delivers biodiversity net gain in accordance with Schedule 7A of the Town and Country Planning Act 1990.

NOTE: Please refer to the Informatives attached to this decision.

 

11. The holiday unit hereby permitted shall only be used for holiday purposes and not for any other residential use falling within Class C3 of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), or any Statutory Instrument revoking and re-enacting that Order with or without modification. For the avoidance of doubt ‘any other residential use’ includes a person’s or persons’ main residence, or a permanent residential unit of accommodation.

 

A register of all occupiers, detailing dates, names and usual addresses shall be maintained by the site owner and shall be kept up-to-date and available for inspection by the Local Planning Authority. The register of occupiers above shall be collected by the landowner or their nominated person.

 

REASON: To ensure that the accommodation is not used for permanent occupation and to prevent the establishment of a permanent dwelling in the countryside contrary to local planning policy.

 

12. The sitting, design and appearance of the hereby approved huts shall be implemented, maintained and thereafter retained for the lifetime of the development in strict accordance with the hereby approved Proposed Site Plan referenced 1652 PL3 REV F and Proposed Hut Plan & Elevations referenced 1652 PL4 REV F.

 

REASON: In the interest of ensuring that the proposal has an acceptable impact on the local landscape and to ensure that the impact lighspill is appropriately managed for the benefit of legally protected South Ham SAC bat species.

 

13. The development hereby permitted shall be carried out in strict accordance with the hereby approved Ecology Report referenced SWE 2319 VERSION 3 and received on 2nd October 2025.

 

REASON: In order to secure biodiversity enhancements required that local plan policies that do not otherwise fall within the remit of Biodiversity Net Gain.

 

14. No external lighting shall be installed on, or in association with the new building, at any time, except for low-intensity, PIR motion-activated lights on a short timer (maximum 2 minutes), sensitive to large objects only (to avoid triggering by bats or other wildlife). Any lights should be mounted at a height no greater than 1.9m from ground level, directed/cowled downwards and away from hedges and trees. The lights should produce only narrow spectrum, low-intensity light output, UV-free, with a warm colour-temperature (2,700K or less) and a wavelength of 550nm or more.

 

All internal lighting shall be designed to have low illuminance output, no UV component, maximum colour temperature of 2,700 Kelvin and minimum light wavelength of 550 nanometres.  Lighting units shall be recessed ceiling mounted and directed/cowled away from windows and glazed doors. 

 

REASON: For protection of legally protected light-sensitive bats.

 

15. Any contamination that is found to be present at the application site during construction of the development hereby permitted shall be reported immediately to the local planning authority. Development on the part of the site affected shall be suspended and a risk assessment carried out and submitted to and approved in writing by the local planning authority. Where any unacceptable risk is found remediation and verification schemes shall be submitted to and approved in writing by the local planning authority. These approved schemes shall be carried out before the development or relevant phase of development is resumed or continued.

 

REASON: To ensure that any contamination found during site works is dealt with appropriately.

 

 

Supporting documents: